An Energy Smart Initiative

Use Of Solar And Wind Energy In DCK

In DCK power obtained by solar and wind energy is consumed. In DCK 1.5 M.watt advanced Solar pillar project is being activated, for 50 M.watt dedicated wind and Energy Park is being built and in future, it will be 100 M.watt. In sector-3 most of the street lights are solar poles based which uses sunlight as an energy source. In DCK sector-3 First Hybrid Solar and Wind Mill, Every light system is activated that environmentally safes solar and wind energy and stabilizes thermal conventional energy which is the provenance of green energy.